All Solar Power in Tampa
49+ yrs
Experience
80 km
Service radius
2-10
Employees
Profile information
About All Solar Power
Locally owned Tampa solar company providing solar solutions since 1977
Tampa, Florida 33614
Tampa, Florida 33614
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review All Solar Power!
Frequently Asked Questions
How do I get a quote from All Solar Power?
You can request a quote through the form on this page or contact All Solar Power directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does All Solar Power serve?
All Solar Power is based in Tampa and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does All Solar Power hold?
This profile lists the following reported certifications: NABCEP. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does All Solar Power offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask All Solar Power for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask All Solar Power for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does All Solar Power handle permits and paperwork?
The exact scope is not verified on this profile. Ask All Solar Power which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from All Solar Power
Send your project details to request follow-up from All Solar Power. Response timing and consultation terms are set by the company.
For All Solar Power
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
All Solar Power