A

All Bay Solar in San Francisco

San Francisco, California·Solar Installation
ResidentialCommercial

15+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About All Bay Solar

Full-service San Francisco solar, energy storage, roofing, and construction company since 2011

San Francisco, California 94112

San Francisco, California 94112

Services Offered

Solar InstallationBattery StorageroofingelectricalMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB AccreditedCSLB Licensed

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Canadian Solar

Inverters

Enphase

Batteries

Tesla PowerwallSunPower

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

San Francisco, CaliforniaOakland, CaliforniaBerkeley, CaliforniaDaly City, CaliforniaSan Mateo, CaliforniaMarin County, California

Customer Reviews

No reviews yet. Be the first to review All Bay Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from All Bay Solar?

You can request a quote through the form on this page or contact All Bay Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does All Bay Solar serve?

All Bay Solar is based in San Francisco and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does All Bay Solar hold?

This profile lists the following reported certifications: BBB Accredited, CSLB Licensed. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does All Bay Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask All Bay Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask All Bay Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does All Bay Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask All Bay Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2011
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from All Bay Solar

Send your project details to request follow-up from All Bay Solar. Response timing and consultation terms are set by the company.

For All Bay Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
A

All Bay Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.