Albion Power Company in San Francisco
21+ yrs
Experience
60 km
Service radius
11-50
Employees
Profile information
About Albion Power Company
San Francisco solar specialists since 2005 with licensed electricians, roofers, and top 1% BuildZoom ranking
San Francisco, California 94117
San Francisco, California 94117
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Albion Power Company!
Frequently Asked Questions
How do I get a quote from Albion Power Company?
You can request a quote through the form on this page or contact Albion Power Company directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Albion Power Company serve?
Albion Power Company is based in San Francisco and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Albion Power Company hold?
This profile lists the following reported certifications: CSLB Licensed. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Albion Power Company offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Albion Power Company for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Albion Power Company for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Albion Power Company handle permits and paperwork?
The exact scope is not verified on this profile. Ask Albion Power Company which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Albion Power Company
Send your project details to request follow-up from Albion Power Company. Response timing and consultation terms are set by the company.
For Albion Power Company
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Albion Power Company