A

Albany Solar Solutions in Albany

Albany, New York·Solar Installation
Residential

11+ yrs

Experience

80 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Albany Solar Solutions

Family-owned solar contractor specializing in custom solar panel systems for homes across Upstate New York since 2015

Albany, New York 12180

Albany, New York 12180

Services Offered

Solar InstallationBattery StorageSolar Design

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Albany, New YorkTroy, New YorkSchenectady, New YorkSaratoga Springs, New YorkClifton Park, New YorkLatham, New York

Customer Reviews

No reviews yet. Be the first to review Albany Solar Solutions!

Write a Review

Frequently Asked Questions

How do I get a quote from Albany Solar Solutions?

You can request a quote through the form on this page or contact Albany Solar Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Albany Solar Solutions serve?

Albany Solar Solutions is based in Albany and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Albany Solar Solutions hold?

This profile does not list independently verified certifications. Ask Albany Solar Solutions for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Albany Solar Solutions offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Albany Solar Solutions for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Albany Solar Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Albany Solar Solutions handle permits and paperwork?

The exact scope is not verified on this profile. Ask Albany Solar Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2015
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Albany Solar Solutions

Send your project details to request follow-up from Albany Solar Solutions. Response timing and consultation terms are set by the company.

For Albany Solar Solutions

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
A

Albany Solar Solutions

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.