A

Airis Energy Solutions in Miami

Miami, Florida·Solar Installation
ResidentialCommercial

30+ yrs

Experience

150 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Airis Energy Solutions

Global electronics company with 25+ years of experience delivering residential and commercial solar across Florida

Miami, Florida 33122

Miami, Florida 33122

Services Offered

Solar InstallationBattery StorageMaintenanceMonitoringSolar DesignCommercial SolarGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

State Certified Solar Contractor

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Miami, FloridaFort Lauderdale, FloridaOrlando, FloridaTampa, FloridaJacksonville, FloridaDoral, FloridaHialeah, Florida

Customer Reviews

No reviews yet. Be the first to review Airis Energy Solutions!

Write a Review

Frequently Asked Questions

How do I get a quote from Airis Energy Solutions?

You can request a quote through the form on this page or contact Airis Energy Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Airis Energy Solutions serve?

Airis Energy Solutions is based in Miami and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Airis Energy Solutions hold?

This profile lists the following reported certifications: State Certified Solar Contractor. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Airis Energy Solutions offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Airis Energy Solutions for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Airis Energy Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Airis Energy Solutions handle permits and paperwork?

The exact scope is not verified on this profile. Ask Airis Energy Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded1996
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Airis Energy Solutions

Send your project details to request follow-up from Airis Energy Solutions. Response timing and consultation terms are set by the company.

For Airis Energy Solutions

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
A

Airis Energy Solutions

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.