A

Advanced Solar in Washington

Washington, District of Columbia·Solar Installation
ResidentialCommercial

17+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Advanced Solar

Full-service solar installer serving DC and Maryland since 2009 with thousands of residential and commercial systems

Washington, District of Columbia 20785

Washington, District of Columbia 20785

Services Offered

Solar InstallationSolar DesignMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB AccreditedMontgomery County Green Bank Partner

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Washington, District of ColumbiaLandover, District of ColumbiaBowie, District of ColumbiaCollege Park, District of ColumbiaGreenbelt, District of ColumbiaHyattsville, District of Columbia

Customer Reviews

No reviews yet. Be the first to review Advanced Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Advanced Solar?

You can request a quote through the form on this page or contact Advanced Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Advanced Solar serve?

Advanced Solar is based in Washington and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Advanced Solar hold?

This profile lists the following reported certifications: BBB Accredited, Montgomery County Green Bank Partner. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Advanced Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Advanced Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Advanced Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Advanced Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Advanced Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2009
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Advanced Solar

Send your project details to request follow-up from Advanced Solar. Response timing and consultation terms are set by the company.

For Advanced Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
A

Advanced Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.