A

Action Solar & Electric in Durham

Durham, North Carolina·Solar Installation
ResidentialCommercial

11+ yrs

Experience

80 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Action Solar & Electric

Full-service solar installer in Chapel Hill serving the Triangle since 2015 — NABCEP PV Installation Professional

Durham, North Carolina 27516

Durham, North Carolina 27516

Services Offered

Solar InstallationBattery StorageMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP PV Installation ProfessionalOSHA 10 CertifiedMaster ElectricianLicensed Electrical Contractor NC

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Durham, North CarolinaChapel Hill, North CarolinaRaleigh, North CarolinaCary, North CarolinaHillsborough, North Carolina

Customer Reviews

No reviews yet. Be the first to review Action Solar & Electric!

Write a Review

Frequently Asked Questions

How do I get a quote from Action Solar & Electric?

You can request a quote through the form on this page or contact Action Solar & Electric directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Action Solar & Electric serve?

Action Solar & Electric is based in Durham and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Action Solar & Electric hold?

This profile lists the following reported certifications: NABCEP PV Installation Professional, OSHA 10 Certified, Master Electrician, Licensed Electrical Contractor NC. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Action Solar & Electric offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Action Solar & Electric for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Action Solar & Electric for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Action Solar & Electric handle permits and paperwork?

The exact scope is not verified on this profile. Ask Action Solar & Electric which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2015
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Action Solar & Electric

Send your project details to request follow-up from Action Solar & Electric. Response timing and consultation terms are set by the company.

For Action Solar & Electric

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
A

Action Solar & Electric

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.