ACES Energy in Buffalo
17+ yrs
Experience
240+
Projects
150 km
Service radius
1-10
Employees
Profile information
About ACES Energy
Western New York renewable energy specialist with 30+ years of experience in solar PV, geothermal, and EV charging since 2009
Buffalo, New York 14043
Buffalo, New York 14043
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review ACES Energy!
Frequently Asked Questions
How do I get a quote from ACES Energy?
You can request a quote through the form on this page or contact ACES Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does ACES Energy serve?
ACES Energy is based in Buffalo and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does ACES Energy hold?
This profile does not list independently verified certifications. Ask ACES Energy for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does ACES Energy offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask ACES Energy for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask ACES Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does ACES Energy handle permits and paperwork?
The exact scope is not verified on this profile. Ask ACES Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from ACES Energy
Send your project details to request follow-up from ACES Energy. Response timing and consultation terms are set by the company.
For ACES Energy
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
ACES Energy