ACE LLC Solar in Huntsville
150 km
Service radius
1-10
Employees
Profile information
About ACE LLC Solar
Tennessee Valley solar contractor specializing in behind-the-meter solar installations with battery backup for residential, commercial, and industrial clients
Huntsville, Alabama 38478
Huntsville, Alabama 38478
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review ACE LLC Solar!
Frequently Asked Questions
How do I get a quote from ACE LLC Solar?
You can request a quote through the form on this page or contact ACE LLC Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does ACE LLC Solar serve?
ACE LLC Solar is based in Huntsville and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does ACE LLC Solar hold?
This profile does not list independently verified certifications. Ask ACE LLC Solar for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does ACE LLC Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask ACE LLC Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask ACE LLC Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does ACE LLC Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask ACE LLC Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from ACE LLC Solar
Send your project details to request follow-up from ACE LLC Solar. Response timing and consultation terms are set by the company.
For ACE LLC Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
ACE LLC Solar