A

A&R Solar in Tacoma

Tacoma, Washington·Solar Installation
ResidentialCommercial

19+ yrs

Experience

100 km

Service radius

51-100

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About A&R Solar

Washington and Oregon's trusted solar company with over 17 years of experience serving the Puget Sound region

Tacoma, Washington 98144

Tacoma, Washington 98144

Services Offered

Solar InstallationBattery StorageMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP CertifiedB Corp Certified

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Inverters

Enphase

Batteries

Tesla PowerwallEnphase IQ Battery

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Tacoma, WashingtonSeattle, WashingtonOlympia, WashingtonBellevue, WashingtonPortland, Washington

Customer Reviews

No reviews yet. Be the first to review A&R Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from A&R Solar?

You can request a quote through the form on this page or contact A&R Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does A&R Solar serve?

A&R Solar is based in Tacoma and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does A&R Solar hold?

This profile lists the following reported certifications: NABCEP Certified, B Corp Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does A&R Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask A&R Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask A&R Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does A&R Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask A&R Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2007
Employees51-100
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from A&R Solar

Send your project details to request follow-up from A&R Solar. Response timing and consultation terms are set by the company.

For A&R Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
A

A&R Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.