P

Primus Elektro Solutions GmbH (UltraSolar) in Mannheim

Mannheim, Baden-Württemberg·Solar Installation
ResidentialCommercial

7+ yrs

Experience

50 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Primus Elektro Solutions GmbH (UltraSolar)

Photovoltaik und Elektrotechnik in Mannheim mit Showroom

Mannheim, Baden-Württemberg 68309

Mannheim, Baden-Württemberg 68309

Services Offered

Solar InstallationBattery Storagewallbox_installationsolar_consultation

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Mannheim, Baden-WürttembergLudwigshafen, Baden-WürttembergHeidelberg, Baden-WürttembergWeinheim, Baden-WürttembergSchwetzingen, Baden-Württemberg

Customer Reviews

No reviews yet. Be the first to review Primus Elektro Solutions GmbH (UltraSolar)!

Write a Review

Frequently Asked Questions

How do I get a quote from Primus Elektro Solutions GmbH (UltraSolar)?

You can request a quote through the form on this page or contact Primus Elektro Solutions GmbH (UltraSolar) directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Primus Elektro Solutions GmbH (UltraSolar) serve?

Primus Elektro Solutions GmbH (UltraSolar) is based in Mannheim and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Primus Elektro Solutions GmbH (UltraSolar) hold?

This profile does not list independently verified certifications. Ask Primus Elektro Solutions GmbH (UltraSolar) for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Primus Elektro Solutions GmbH (UltraSolar) offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Primus Elektro Solutions GmbH (UltraSolar) for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Primus Elektro Solutions GmbH (UltraSolar) for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Primus Elektro Solutions GmbH (UltraSolar) handle permits and paperwork?

The exact scope is not verified on this profile. Ask Primus Elektro Solutions GmbH (UltraSolar) which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2019
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Primus Elektro Solutions GmbH (UltraSolar)

Send your project details to request follow-up from Primus Elektro Solutions GmbH (UltraSolar). Response timing and consultation terms are set by the company.

For Primus Elektro Solutions GmbH (UltraSolar)

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
P

Primus Elektro Solutions GmbH (UltraSolar)

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.