SunPark S.r.l. in Rome
13+ yrs
Experience
60 km
Service radius
11-50
Employees
Profile information
About SunPark S.r.l.
Installazione fotovoltaica professionale a Roma e nel Lazio
Rome, Lazio 00131
Rome, Lazio 00131
Services Offered
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review SunPark S.r.l.!
Frequently Asked Questions
How do I get a quote from SunPark S.r.l.?
You can request a quote through the form on this page or contact SunPark S.r.l. directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does SunPark S.r.l. serve?
SunPark S.r.l. is based in Rome and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does SunPark S.r.l. hold?
This profile does not list independently verified certifications. Ask SunPark S.r.l. for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does SunPark S.r.l. offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask SunPark S.r.l. for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask SunPark S.r.l. for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does SunPark S.r.l. handle permits and paperwork?
The exact scope is not verified on this profile. Ask SunPark S.r.l. which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from SunPark S.r.l.
Send your project details to request follow-up from SunPark S.r.l.. Response timing and consultation terms are set by the company.
For SunPark S.r.l.
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
SunPark S.r.l.