S

SUN@NET S.r.l. in Catania

Catania, Sicily·Solar Installation
ResidentialIndustrial

7+ yrs

Experience

50 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About SUN@NET S.r.l.

Installatore autorizzato SunPower e SENEC nel centro di Catania

Catania, Sicily 95131

Catania, Sicily 95131

Services Offered

Solar InstallationMaintenancesolar_consultationEnergy Audit

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

SunPower Authorized InstallerSENEC Authorized

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPower

Batteries

SENEC

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Catania, SicilyMisterbianco, SicilyPaternò, SicilyBelpasso, SicilyNicolosi, Sicily

Customer Reviews

No reviews yet. Be the first to review SUN@NET S.r.l.!

Write a Review

Frequently Asked Questions

How do I get a quote from SUN@NET S.r.l.?

You can request a quote through the form on this page or contact SUN@NET S.r.l. directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does SUN@NET S.r.l. serve?

SUN@NET S.r.l. is based in Catania and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does SUN@NET S.r.l. hold?

This profile lists the following reported certifications: SunPower Authorized Installer, SENEC Authorized. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does SUN@NET S.r.l. offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask SUN@NET S.r.l. for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask SUN@NET S.r.l. for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does SUN@NET S.r.l. handle permits and paperwork?

The exact scope is not verified on this profile. Ask SUN@NET S.r.l. which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2019
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from SUN@NET S.r.l.

Send your project details to request follow-up from SUN@NET S.r.l.. Response timing and consultation terms are set by the company.

For SUN@NET S.r.l.

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

SUN@NET S.r.l.

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.