sunday solar GmbH in Berlin
5+ yrs
Experience
50 km
Service radius
Profile information
About sunday solar GmbH
Fachbetrieb für Solaranlagen, Ladeinfrastruktur und Elektroinstallation in Berlin und Brandenburg
Berlin, Berlin 12347
Berlin, Berlin 12347
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review sunday solar GmbH!
Frequently Asked Questions
How do I get a quote from sunday solar GmbH?
You can request a quote through the form on this page or contact sunday solar GmbH directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does sunday solar GmbH serve?
sunday solar GmbH is based in Berlin and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does sunday solar GmbH hold?
This profile does not list independently verified certifications. Ask sunday solar GmbH for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does sunday solar GmbH offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask sunday solar GmbH for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask sunday solar GmbH for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does sunday solar GmbH handle permits and paperwork?
The exact scope is not verified on this profile. Ask sunday solar GmbH which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from sunday solar GmbH
Send your project details to request follow-up from sunday solar GmbH. Response timing and consultation terms are set by the company.
For sunday solar GmbH
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
sunday solar GmbH