Solenia Srl in Venice
14+ yrs
Experience
40 km
Service radius
11-50
Employees
Profile information
About Solenia Srl
Soluzioni fotovoltaiche personalizzate a Venezia e provincia
Venice, Veneto 30035
Venice, Veneto 30035
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Solenia Srl!
Frequently Asked Questions
How do I get a quote from Solenia Srl?
You can request a quote through the form on this page or contact Solenia Srl directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Solenia Srl serve?
Solenia Srl is based in Venice and serves within a 40 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Solenia Srl hold?
This profile lists the following reported certifications: Edison Business Partner. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Solenia Srl offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solenia Srl for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Solenia Srl for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Solenia Srl handle permits and paperwork?
The exact scope is not verified on this profile. Ask Solenia Srl which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Solenia Srl
Send your project details to request follow-up from Solenia Srl. Response timing and consultation terms are set by the company.
For Solenia Srl
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Solenia Srl