S

SBT Energie GmbH in Dresden

Dresden, Saxony·Solar Installation
ResidentialCommercialIndustrial

11+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About SBT Energie GmbH

Sächsischer Handwerksbetrieb für Photovoltaik-Komplettinstallationen in Dresden

Dresden, Saxony 01189

Dresden, Saxony 01189

Services Offered

Solar InstallationBattery Storageelectrical_installationsolar_consultation

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Dresden, SaxonyFreital, SaxonyDöbeln, SaxonyFreiberg, SaxonyChemnitz, Saxony

Customer Reviews

No reviews yet. Be the first to review SBT Energie GmbH!

Write a Review

Frequently Asked Questions

How do I get a quote from SBT Energie GmbH?

You can request a quote through the form on this page or contact SBT Energie GmbH directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does SBT Energie GmbH serve?

SBT Energie GmbH is based in Dresden and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does SBT Energie GmbH hold?

This profile does not list independently verified certifications. Ask SBT Energie GmbH for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does SBT Energie GmbH offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask SBT Energie GmbH for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask SBT Energie GmbH for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does SBT Energie GmbH handle permits and paperwork?

The exact scope is not verified on this profile. Ask SBT Energie GmbH which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2015
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from SBT Energie GmbH

Send your project details to request follow-up from SBT Energie GmbH. Response timing and consultation terms are set by the company.

For SBT Energie GmbH

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

SBT Energie GmbH

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.