R

RS Power Solution S.r.l.s. in Naples

Naples, Campania·Solar Installation
ResidentialCommercialIndustrial

21+ yrs

Experience

50 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About RS Power Solution S.r.l.s.

Installazioni fotovoltaiche professionali con gestione completa del progetto nell'area est di Napoli

Naples, Campania 80038

Naples, Campania 80038

Services Offered

Solar InstallationBattery Storagesolar_consultation

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Napoli, CampaniaPomigliano d'Arco, CampaniaNola, CampaniaAcerra, CampaniaCasalnuovo di Napoli, Campania

Customer Reviews

No reviews yet. Be the first to review RS Power Solution S.r.l.s.!

Write a Review

Frequently Asked Questions

How do I get a quote from RS Power Solution S.r.l.s.?

You can request a quote through the form on this page or contact RS Power Solution S.r.l.s. directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does RS Power Solution S.r.l.s. serve?

RS Power Solution S.r.l.s. is based in Naples and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does RS Power Solution S.r.l.s. hold?

This profile does not list independently verified certifications. Ask RS Power Solution S.r.l.s. for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does RS Power Solution S.r.l.s. offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask RS Power Solution S.r.l.s. for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask RS Power Solution S.r.l.s. for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does RS Power Solution S.r.l.s. handle permits and paperwork?

The exact scope is not verified on this profile. Ask RS Power Solution S.r.l.s. which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2005
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from RS Power Solution S.r.l.s.

Send your project details to request follow-up from RS Power Solution S.r.l.s.. Response timing and consultation terms are set by the company.

For RS Power Solution S.r.l.s.

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
R

RS Power Solution S.r.l.s.

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.