R

RexEnergy S.r.l. in Brescia

Brescia, Lombardy·Solar Installation
ResidentialCommercial

14+ yrs

Experience

40 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About RexEnergy S.r.l.

Installatore certificato SunPower, SolarEdge e Tesla a Brescia

Brescia, Lombardy 25131

Brescia, Lombardy 25131

Services Offered

Solar InstallationBattery Storagesolar_consultation

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

SunPower-Maxeon CertifiedSolarEdge SpecialistTesla Excellent Installer

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPower Maxeon

Inverters

SolarEdge

Batteries

Tesla PowerwallZucchetti ZCS

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Brescia, LombardyLumezzane, LombardyGardone Val Trompia, LombardyConcesio, LombardyNave, Lombardy

Customer Reviews

No reviews yet. Be the first to review RexEnergy S.r.l.!

Write a Review

Frequently Asked Questions

How do I get a quote from RexEnergy S.r.l.?

You can request a quote through the form on this page or contact RexEnergy S.r.l. directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does RexEnergy S.r.l. serve?

RexEnergy S.r.l. is based in Brescia and serves within a 40 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does RexEnergy S.r.l. hold?

This profile lists the following reported certifications: SunPower-Maxeon Certified, SolarEdge Specialist, Tesla Excellent Installer. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does RexEnergy S.r.l. offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask RexEnergy S.r.l. for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask RexEnergy S.r.l. for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does RexEnergy S.r.l. handle permits and paperwork?

The exact scope is not verified on this profile. Ask RexEnergy S.r.l. which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2012
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from RexEnergy S.r.l.

Send your project details to request follow-up from RexEnergy S.r.l.. Response timing and consultation terms are set by the company.

For RexEnergy S.r.l.

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
R

RexEnergy S.r.l.

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.