Qesco S.r.l. in Lecce
11+ yrs
Experience
80 km
Service radius
1-10
Employees
Profile information
About Qesco S.r.l.
Installatore certificato Tesla per fotovoltaico e accumulo energetico a Lecce
Lecce, Puglia 73100
Lecce, Puglia 73100
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Batteries
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Qesco S.r.l.!
Frequently Asked Questions
How do I get a quote from Qesco S.r.l.?
You can request a quote through the form on this page or contact Qesco S.r.l. directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Qesco S.r.l. serve?
Qesco S.r.l. is based in Lecce and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Qesco S.r.l. hold?
This profile lists the following reported certifications: Tesla Certified Installer. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Qesco S.r.l. offer?
Warranty terms are not documented on this profile. Ask Qesco S.r.l. for the equipment, workmanship, exclusions, transfer, and claim terms in writing.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Qesco S.r.l. for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Qesco S.r.l. handle permits and paperwork?
The exact scope is not verified on this profile. Ask Qesco S.r.l. which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Qesco S.r.l.
Send your project details to request follow-up from Qesco S.r.l.. Response timing and consultation terms are set by the company.
For Qesco S.r.l.
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Qesco S.r.l.