N

NPN Energy S.r.l. in Perugia

Perugia, Umbria·Solar Installation
ResidentialCommercial

13+ yrs

Experience

40 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About NPN Energy S.r.l.

Installazione di impianti fotovoltaici SunPower con accumulo Tesla per residenziale e commerciale a Perugia dal 2013

Perugia, Umbria 06059

Perugia, Umbria 06059

Services Offered

Solar InstallationBattery Storagesolar_consultation

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Tesla Certified InstallerSunPower Partner

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPower

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Perugia, UmbriaTodi, UmbriaSpoleto, UmbriaOrvieto, UmbriaTerni, Umbria

Customer Reviews

No reviews yet. Be the first to review NPN Energy S.r.l.!

Write a Review

Frequently Asked Questions

How do I get a quote from NPN Energy S.r.l.?

You can request a quote through the form on this page or contact NPN Energy S.r.l. directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does NPN Energy S.r.l. serve?

NPN Energy S.r.l. is based in Perugia and serves within a 40 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does NPN Energy S.r.l. hold?

This profile lists the following reported certifications: Tesla Certified Installer, SunPower Partner. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does NPN Energy S.r.l. offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask NPN Energy S.r.l. for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask NPN Energy S.r.l. for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does NPN Energy S.r.l. handle permits and paperwork?

The exact scope is not verified on this profile. Ask NPN Energy S.r.l. which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2013
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from NPN Energy S.r.l.

Send your project details to request follow-up from NPN Energy S.r.l.. Response timing and consultation terms are set by the company.

For NPN Energy S.r.l.

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
N

NPN Energy S.r.l.

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.