N

NOON S.r.l. in Palermo

Palermo, Sicily·Solar Installation
CommercialIndustrial

16+ yrs

Experience

50 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About NOON S.r.l.

Soluzioni EPC per impianti fotovoltaici commerciali e industriali

Palermo, Sicily 90135

Palermo, Sicily 90135

Services Offered

Solar Installationsolar_consultationEnergy Audit

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

JA Solar

Inverters

ZCS Azzurro

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Palermo, SicilyTrapani, SicilyAgrigento, SicilyCaltanissetta, SicilyEnna, Sicily

Customer Reviews

No reviews yet. Be the first to review NOON S.r.l.!

Write a Review

Frequently Asked Questions

How do I get a quote from NOON S.r.l.?

You can request a quote through the form on this page or contact NOON S.r.l. directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does NOON S.r.l. serve?

NOON S.r.l. is based in Palermo and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does NOON S.r.l. hold?

This profile does not list independently verified certifications. Ask NOON S.r.l. for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does NOON S.r.l. offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask NOON S.r.l. for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask NOON S.r.l. for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does NOON S.r.l. handle permits and paperwork?

The exact scope is not verified on this profile. Ask NOON S.r.l. which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2010
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from NOON S.r.l.

Send your project details to request follow-up from NOON S.r.l.. Response timing and consultation terms are set by the company.

For NOON S.r.l.

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
N

NOON S.r.l.

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.