M

MB Elettro Impianti in Perugia

Perugia, Umbria·Solar Installation
ResidentialCommercialIndustrial

21+ yrs

Experience

40 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About MB Elettro Impianti

Installazione e manutenzione di impianti fotovoltaici per residenziale, commerciale e industriale a Perugia dal 2005

Perugia, Umbria 06129

Perugia, Umbria 06129

Services Offered

Solar InstallationMaintenancesolar_consultation

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Inverters

Power OneFronius

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Perugia, UmbriaAssisi, UmbriaBastia Umbra, UmbriaCittà di Castello, UmbriaUmbertide, Umbria

Customer Reviews

No reviews yet. Be the first to review MB Elettro Impianti!

Write a Review

Frequently Asked Questions

How do I get a quote from MB Elettro Impianti?

You can request a quote through the form on this page or contact MB Elettro Impianti directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does MB Elettro Impianti serve?

MB Elettro Impianti is based in Perugia and serves within a 40 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does MB Elettro Impianti hold?

This profile does not list independently verified certifications. Ask MB Elettro Impianti for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does MB Elettro Impianti offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask MB Elettro Impianti for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask MB Elettro Impianti for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does MB Elettro Impianti handle permits and paperwork?

The exact scope is not verified on this profile. Ask MB Elettro Impianti which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2005
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from MB Elettro Impianti

Send your project details to request follow-up from MB Elettro Impianti. Response timing and consultation terms are set by the company.

For MB Elettro Impianti

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
M

MB Elettro Impianti

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.