MAE Solar in Düsseldorf
4+ yrs
Experience
100+
Projects
40 km
Service radius
2-10
Employees
Profile information
About MAE Solar
Persönlicher Photovoltaik-Partner in Düsseldorf — über 100 installierte Anlagen
Düsseldorf, North Rhine-Westphalia 40593
Düsseldorf, North Rhine-Westphalia 40593
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review MAE Solar!
Frequently Asked Questions
How do I get a quote from MAE Solar?
You can request a quote through the form on this page or contact MAE Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does MAE Solar serve?
MAE Solar is based in Düsseldorf and serves within a 40 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does MAE Solar hold?
This profile does not list independently verified certifications. Ask MAE Solar for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does MAE Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask MAE Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask MAE Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does MAE Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask MAE Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from MAE Solar
Send your project details to request follow-up from MAE Solar. Response timing and consultation terms are set by the company.
For MAE Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
MAE Solar