I

IM-EL Osasio Srl in Turin

Turin, Piedmont·Solar Installation
ResidentialCommercial

51+ yrs

Experience

50 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About IM-EL Osasio Srl

Dal 1975 impianti elettrici e fotovoltaici — partner SunPower e Tesla nel Torinese

Turin, Piedmont 10040

Turin, Piedmont 10040

Services Offered

Solar InstallationBattery StorageEV Chargingsolar_consultation

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

SunPower Elite PartnerMennekes Quality Partner

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPower

Inverters

Enphase

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Torino, PiedmontOsasio, PiedmontPinerolo, PiedmontCarmagnola, PiedmontNichelino, Piedmont

Customer Reviews

No reviews yet. Be the first to review IM-EL Osasio Srl!

Write a Review

Frequently Asked Questions

How do I get a quote from IM-EL Osasio Srl?

You can request a quote through the form on this page or contact IM-EL Osasio Srl directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does IM-EL Osasio Srl serve?

IM-EL Osasio Srl is based in Turin and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does IM-EL Osasio Srl hold?

This profile lists the following reported certifications: SunPower Elite Partner, Mennekes Quality Partner. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does IM-EL Osasio Srl offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask IM-EL Osasio Srl for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask IM-EL Osasio Srl for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does IM-EL Osasio Srl handle permits and paperwork?

The exact scope is not verified on this profile. Ask IM-EL Osasio Srl which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded1975
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from IM-EL Osasio Srl

Send your project details to request follow-up from IM-EL Osasio Srl. Response timing and consultation terms are set by the company.

For IM-EL Osasio Srl

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
I

IM-EL Osasio Srl

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.