GTech Energy Srl in Venice
17+ yrs
Experience
60 km
Service radius
11-50
Employees
Profile information
About GTech Energy Srl
Oltre 7.000 installazioni fotovoltaiche in Veneto e nel Nord Italia
Venice, Veneto 38121
Venice, Veneto 38121
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
30yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review GTech Energy Srl!
Frequently Asked Questions
How do I get a quote from GTech Energy Srl?
You can request a quote through the form on this page or contact GTech Energy Srl directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does GTech Energy Srl serve?
GTech Energy Srl is based in Venice and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does GTech Energy Srl hold?
This profile lists the following reported certifications: SOA OG9. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does GTech Energy Srl offer?
This profile reports 30-year panel coverage and 10-year workmanship coverage. Ask GTech Energy Srl for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask GTech Energy Srl for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does GTech Energy Srl handle permits and paperwork?
The exact scope is not verified on this profile. Ask GTech Energy Srl which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from GTech Energy Srl
Send your project details to request follow-up from GTech Energy Srl. Response timing and consultation terms are set by the company.
For GTech Energy Srl
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
GTech Energy Srl