G

Greenovative GmbH in Nuremberg

Nuremberg, Bavaria·Solar Installation
CommercialIndustrial

14+ yrs

Experience

100+

Projects

100 km

Service radius

51-100

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Greenovative GmbH

Spezialist für Freiflächen-Photovoltaik und Solarparks in Nürnberg

Nuremberg, Bavaria 90429

Nuremberg, Bavaria 90429

Services Offered

Solar Installationsolar_consultationproject_development

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Nürnberg, BavariaFürth, BavariaErlangen, BavariaStuttgart, BavariaOldenburg, Bavaria

Customer Reviews

No reviews yet. Be the first to review Greenovative GmbH!

Write a Review

Frequently Asked Questions

How do I get a quote from Greenovative GmbH?

You can request a quote through the form on this page or contact Greenovative GmbH directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Greenovative GmbH serve?

Greenovative GmbH is based in Nuremberg and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Greenovative GmbH hold?

This profile does not list independently verified certifications. Ask Greenovative GmbH for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Greenovative GmbH offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Greenovative GmbH for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Greenovative GmbH for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Greenovative GmbH handle permits and paperwork?

The exact scope is not verified on this profile. Ask Greenovative GmbH which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2012
Employees51-100
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Greenovative GmbH

Send your project details to request follow-up from Greenovative GmbH. Response timing and consultation terms are set by the company.

For Greenovative GmbH

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
G

Greenovative GmbH

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.