Extreme Solar Group in Trento
11+ yrs
Experience
50 km
Service radius
1-10
Employees
Profile information
About Extreme Solar Group
5.000 impianti progettati e realizzati — specialisti nel revamping e smaltimento amianto a Trento
Trento, Trentino-Alto Adige 38121
Trento, Trentino-Alto Adige 38121
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Extreme Solar Group!
Frequently Asked Questions
How do I get a quote from Extreme Solar Group?
You can request a quote through the form on this page or contact Extreme Solar Group directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Extreme Solar Group serve?
Extreme Solar Group is based in Trento and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Extreme Solar Group hold?
This profile does not list independently verified certifications. Ask Extreme Solar Group for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does Extreme Solar Group offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Extreme Solar Group for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Extreme Solar Group for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Extreme Solar Group handle permits and paperwork?
The exact scope is not verified on this profile. Ask Extreme Solar Group which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Extreme Solar Group
Send your project details to request follow-up from Extreme Solar Group. Response timing and consultation terms are set by the company.
For Extreme Solar Group
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Extreme Solar Group