E

ENVIRIA Energy Holding GmbH in Frankfurt am Main

Frankfurt am Main, Hesse·Solar Installation
CommercialIndustrial

9+ yrs

Experience

300 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About ENVIRIA Energy Holding GmbH

Deutschlands führender Solaranbieter für Gewerbe und Industrie mit Hauptsitz in Frankfurt am Main

Frankfurt am Main, Hesse 60314

Frankfurt am Main, Hesse 60314

Services Offered

Solar InstallationBattery StorageSolar DesignMaintenanceMonitoringEV Charging

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

15yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Frankfurt am Main, HesseBerlin, HesseMünchen, HesseHamburg, HesseKöln, HesseStuttgart, Hesse

Customer Reviews

No reviews yet. Be the first to review ENVIRIA Energy Holding GmbH!

Write a Review

Frequently Asked Questions

How do I get a quote from ENVIRIA Energy Holding GmbH?

You can request a quote through the form on this page or contact ENVIRIA Energy Holding GmbH directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does ENVIRIA Energy Holding GmbH serve?

ENVIRIA Energy Holding GmbH is based in Frankfurt am Main and serves within a 300 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does ENVIRIA Energy Holding GmbH hold?

This profile does not list independently verified certifications. Ask ENVIRIA Energy Holding GmbH for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does ENVIRIA Energy Holding GmbH offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask ENVIRIA Energy Holding GmbH for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask ENVIRIA Energy Holding GmbH for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does ENVIRIA Energy Holding GmbH handle permits and paperwork?

The exact scope is not verified on this profile. Ask ENVIRIA Energy Holding GmbH which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2017
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from ENVIRIA Energy Holding GmbH

Send your project details to request follow-up from ENVIRIA Energy Holding GmbH. Response timing and consultation terms are set by the company.

For ENVIRIA Energy Holding GmbH

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

ENVIRIA Energy Holding GmbH

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.