e

enerix Regensburg in Regensburg

Regensburg, Bavaria·Solar Installation
ResidentialCommercial

14+ yrs

Experience

50 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About enerix Regensburg

Photovoltaik, Stromspeicher und Wärmepumpen in Regensburg

Regensburg, Bavaria 93059

Regensburg, Bavaria 93059

Services Offered

Solar InstallationBattery Storageheat_pumpsolar_consultation

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Regensburg, BavariaRegenstauf, BavariaHemau, BavariaKelheim, BavariaNeutraubling, BavariaLappersdorf, Bavaria

Customer Reviews

No reviews yet. Be the first to review enerix Regensburg!

Write a Review

Frequently Asked Questions

How do I get a quote from enerix Regensburg?

You can request a quote through the form on this page or contact enerix Regensburg directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does enerix Regensburg serve?

enerix Regensburg is based in Regensburg and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does enerix Regensburg hold?

This profile does not list independently verified certifications. Ask enerix Regensburg for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does enerix Regensburg offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask enerix Regensburg for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask enerix Regensburg for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does enerix Regensburg handle permits and paperwork?

The exact scope is not verified on this profile. Ask enerix Regensburg which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2012
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from enerix Regensburg

Send your project details to request follow-up from enerix Regensburg. Response timing and consultation terms are set by the company.

For enerix Regensburg

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
e

enerix Regensburg

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.