E

Elektro-Schmitz GmbH & Co. KG in Bonn

Bonn, North Rhine-Westphalia·Solar Installation
ResidentialCommercial

36+ yrs

Experience

30 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Elektro-Schmitz GmbH & Co. KG

Elektrofachbetrieb mit Photovoltaik, Wallbox und Smart Home in Bonn

Bonn, North Rhine-Westphalia 53121

Bonn, North Rhine-Westphalia 53121

Services Offered

Solar InstallationBattery Storagewallboxelectrical_installationsmart_home

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Bonn, North Rhine-WestphaliaAlfter, North Rhine-WestphaliaBornheim, North Rhine-WestphaliaWachtberg, North Rhine-Westphalia

Customer Reviews

No reviews yet. Be the first to review Elektro-Schmitz GmbH & Co. KG!

Write a Review

Frequently Asked Questions

How do I get a quote from Elektro-Schmitz GmbH & Co. KG?

You can request a quote through the form on this page or contact Elektro-Schmitz GmbH & Co. KG directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Elektro-Schmitz GmbH & Co. KG serve?

Elektro-Schmitz GmbH & Co. KG is based in Bonn and serves within a 30 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Elektro-Schmitz GmbH & Co. KG hold?

This profile does not list independently verified certifications. Ask Elektro-Schmitz GmbH & Co. KG for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Elektro-Schmitz GmbH & Co. KG offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Elektro-Schmitz GmbH & Co. KG for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Elektro-Schmitz GmbH & Co. KG for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Elektro-Schmitz GmbH & Co. KG handle permits and paperwork?

The exact scope is not verified on this profile. Ask Elektro-Schmitz GmbH & Co. KG which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded1990
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Elektro-Schmitz GmbH & Co. KG

Send your project details to request follow-up from Elektro-Schmitz GmbH & Co. KG. Response timing and consultation terms are set by the company.

For Elektro-Schmitz GmbH & Co. KG

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

Elektro-Schmitz GmbH & Co. KG

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.