E

Elektro Heinemann in Mannheim

Mannheim, Baden-Württemberg·Solar Installation
ResidentialCommercial

106+ yrs

Experience

50 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Elektro Heinemann

Traditionsreicher Elektrofachbetrieb in Mannheim mit Photovoltaik-Kompetenz

Mannheim, Baden-Württemberg 68169

Mannheim, Baden-Württemberg 68169

Services Offered

Solar InstallationBattery Storagewallbox_installationsmart_home

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Mannheim, Baden-WürttembergLudwigshafen, Baden-WürttembergHeidelberg, Baden-WürttembergViernheim, Baden-WürttembergWeinheim, Baden-Württemberg

Customer Reviews

No reviews yet. Be the first to review Elektro Heinemann!

Write a Review

Frequently Asked Questions

How do I get a quote from Elektro Heinemann?

You can request a quote through the form on this page or contact Elektro Heinemann directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Elektro Heinemann serve?

Elektro Heinemann is based in Mannheim and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Elektro Heinemann hold?

This profile does not list independently verified certifications. Ask Elektro Heinemann for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Elektro Heinemann offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Elektro Heinemann for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Elektro Heinemann for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Elektro Heinemann handle permits and paperwork?

The exact scope is not verified on this profile. Ask Elektro Heinemann which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded1920
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Elektro Heinemann

Send your project details to request follow-up from Elektro Heinemann. Response timing and consultation terms are set by the company.

For Elektro Heinemann

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

Elektro Heinemann

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.