Energiekonzepte Deutschland GmbH (EKD) in Leipzig
8+ yrs
Experience
200 km
Service radius
201-500
Employees
Profile information
About Energiekonzepte Deutschland GmbH (EKD)
Einer der größten Photovoltaik-Anbieter Deutschlands mit Hauptsitz in Leipzig — über 40.000 installierte Solaranlagen
Leipzig, Saxony 04347
Leipzig, Saxony 04347
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
15yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Energiekonzepte Deutschland GmbH (EKD)!
Frequently Asked Questions
How do I get a quote from Energiekonzepte Deutschland GmbH (EKD)?
You can request a quote through the form on this page or contact Energiekonzepte Deutschland GmbH (EKD) directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Energiekonzepte Deutschland GmbH (EKD) serve?
Energiekonzepte Deutschland GmbH (EKD) is based in Leipzig and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Energiekonzepte Deutschland GmbH (EKD) hold?
This profile does not list independently verified certifications. Ask Energiekonzepte Deutschland GmbH (EKD) for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does Energiekonzepte Deutschland GmbH (EKD) offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Energiekonzepte Deutschland GmbH (EKD) for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Energiekonzepte Deutschland GmbH (EKD) for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Energiekonzepte Deutschland GmbH (EKD) handle permits and paperwork?
The exact scope is not verified on this profile. Ask Energiekonzepte Deutschland GmbH (EKD) which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Energiekonzepte Deutschland GmbH (EKD)
Send your project details to request follow-up from Energiekonzepte Deutschland GmbH (EKD). Response timing and consultation terms are set by the company.
For Energiekonzepte Deutschland GmbH (EKD)
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Energiekonzepte Deutschland GmbH (EKD)