D&S SolarTech GmbH in Dresden
4+ yrs
Experience
60 km
Service radius
1-10
Employees
Profile information
About D&S SolarTech GmbH
Photovoltaik-Montage und Solaranlagen in Dresden — schnelle Termine, schlüsselfertige Installation
Dresden, Saxony 01219
Dresden, Saxony 01219
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review D&S SolarTech GmbH!
Frequently Asked Questions
How do I get a quote from D&S SolarTech GmbH?
You can request a quote through the form on this page or contact D&S SolarTech GmbH directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does D&S SolarTech GmbH serve?
D&S SolarTech GmbH is based in Dresden and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does D&S SolarTech GmbH hold?
This profile does not list independently verified certifications. Ask D&S SolarTech GmbH for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does D&S SolarTech GmbH offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask D&S SolarTech GmbH for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask D&S SolarTech GmbH for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does D&S SolarTech GmbH handle permits and paperwork?
The exact scope is not verified on this profile. Ask D&S SolarTech GmbH which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from D&S SolarTech GmbH
Send your project details to request follow-up from D&S SolarTech GmbH. Response timing and consultation terms are set by the company.
For D&S SolarTech GmbH
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
D&S SolarTech GmbH