C

Costruzioni Solari S.r.l. in Lecce

Lecce, Puglia·Solar Installation
ResidentialCommercial

36+ yrs

Experience

40 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Costruzioni Solari S.r.l.

Produttore di pannelli solari termici Panda con certificazione Solar Keymark dal 1990

Lecce, Puglia 73020

Lecce, Puglia 73020

Services Offered

Solar Installationsolar_consultationMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Solar Keymark

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Panda (produzione propria)

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Lecce, PugliaCavallino, PugliaSan Cesario di Lecce, PugliaLizzanello, PugliaVernole, Puglia

Customer Reviews

No reviews yet. Be the first to review Costruzioni Solari S.r.l.!

Write a Review

Frequently Asked Questions

How do I get a quote from Costruzioni Solari S.r.l.?

You can request a quote through the form on this page or contact Costruzioni Solari S.r.l. directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Costruzioni Solari S.r.l. serve?

Costruzioni Solari S.r.l. is based in Lecce and serves within a 40 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Costruzioni Solari S.r.l. hold?

This profile lists the following reported certifications: Solar Keymark. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Costruzioni Solari S.r.l. offer?

Warranty terms are not documented on this profile. Ask Costruzioni Solari S.r.l. for the equipment, workmanship, exclusions, transfer, and claim terms in writing.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Costruzioni Solari S.r.l. for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Costruzioni Solari S.r.l. handle permits and paperwork?

The exact scope is not verified on this profile. Ask Costruzioni Solari S.r.l. which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded1990
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Costruzioni Solari S.r.l.

Send your project details to request follow-up from Costruzioni Solari S.r.l.. Response timing and consultation terms are set by the company.

For Costruzioni Solari S.r.l.

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
C

Costruzioni Solari S.r.l.

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.