B

BP Srl (Beyond Petroleum) in Bergamo

Bergamo, Lombardy·Solar Installation
ResidentialCommercial

25+ yrs

Experience

30 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About BP Srl (Beyond Petroleum)

Installatore certificato Tesla Powerwall e fotovoltaico a Bergamo dal 2001

Bergamo, Lombardy 24123

Bergamo, Lombardy 24123

Services Offered

Solar InstallationBattery StorageEV Chargingsolar_consultation

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Tesla Powerwall Certified

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Inverters

Zucchetti

Batteries

Tesla PowerwallLG Chem

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Bergamo, LombardyUrgnano, LombardyStezzano, LombardyZanica, LombardyGrassobbio, Lombardy

Customer Reviews

No reviews yet. Be the first to review BP Srl (Beyond Petroleum)!

Write a Review

Frequently Asked Questions

How do I get a quote from BP Srl (Beyond Petroleum)?

You can request a quote through the form on this page or contact BP Srl (Beyond Petroleum) directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does BP Srl (Beyond Petroleum) serve?

BP Srl (Beyond Petroleum) is based in Bergamo and serves within a 30 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does BP Srl (Beyond Petroleum) hold?

This profile lists the following reported certifications: Tesla Powerwall Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does BP Srl (Beyond Petroleum) offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask BP Srl (Beyond Petroleum) for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask BP Srl (Beyond Petroleum) for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does BP Srl (Beyond Petroleum) handle permits and paperwork?

The exact scope is not verified on this profile. Ask BP Srl (Beyond Petroleum) which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2001
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from BP Srl (Beyond Petroleum)

Send your project details to request follow-up from BP Srl (Beyond Petroleum). Response timing and consultation terms are set by the company.

For BP Srl (Beyond Petroleum)

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
B

BP Srl (Beyond Petroleum)

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.