Bergmann Elektrotechnik GmbH in Stuttgart
56+ yrs
Experience
50 km
Service radius
11-50
Employees
Profile information
About Bergmann Elektrotechnik GmbH
Seit 1970 Fachbetrieb für Elektrotechnik und Photovoltaik in Stuttgart-Ost
Stuttgart, Baden-Württemberg 70188
Stuttgart, Baden-Württemberg 70188
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
15yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Bergmann Elektrotechnik GmbH!
Frequently Asked Questions
How do I get a quote from Bergmann Elektrotechnik GmbH?
You can request a quote through the form on this page or contact Bergmann Elektrotechnik GmbH directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Bergmann Elektrotechnik GmbH serve?
Bergmann Elektrotechnik GmbH is based in Stuttgart and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Bergmann Elektrotechnik GmbH hold?
This profile lists the following reported certifications: Meisterbetrieb. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Bergmann Elektrotechnik GmbH offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Bergmann Elektrotechnik GmbH for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Bergmann Elektrotechnik GmbH for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Bergmann Elektrotechnik GmbH handle permits and paperwork?
The exact scope is not verified on this profile. Ask Bergmann Elektrotechnik GmbH which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Bergmann Elektrotechnik GmbH
Send your project details to request follow-up from Bergmann Elektrotechnik GmbH. Response timing and consultation terms are set by the company.
For Bergmann Elektrotechnik GmbH
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Bergmann Elektrotechnik GmbH