Al.Ga. S.r.l. in Rome
22+ yrs
Experience
50 km
Service radius
1-10
Employees
Profile information
About Al.Ga. S.r.l.
Fotovoltaico e pompe di calore a Roma con 20 anni di esperienza
Rome, Lazio 00134
Rome, Lazio 00134
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Al.Ga. S.r.l.!
Frequently Asked Questions
How do I get a quote from Al.Ga. S.r.l.?
You can request a quote through the form on this page or contact Al.Ga. S.r.l. directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Al.Ga. S.r.l. serve?
Al.Ga. S.r.l. is based in Rome and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Al.Ga. S.r.l. hold?
This profile does not list independently verified certifications. Ask Al.Ga. S.r.l. for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does Al.Ga. S.r.l. offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Al.Ga. S.r.l. for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Al.Ga. S.r.l. for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Al.Ga. S.r.l. handle permits and paperwork?
The exact scope is not verified on this profile. Ask Al.Ga. S.r.l. which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Al.Ga. S.r.l.
Send your project details to request follow-up from Al.Ga. S.r.l.. Response timing and consultation terms are set by the company.
For Al.Ga. S.r.l.
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Al.Ga. S.r.l.