A

AG Energy Srl in Modena

Modena, Emilia-Romagna·Solar Installation
ResidentialCommercial

15+ yrs

Experience

50 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About AG Energy Srl

Soluzioni energetiche complete per il fotovoltaico, accumulo e ricarica veicoli elettrici a Modena dal 2011

Modena, Emilia-Romagna 41123

Modena, Emilia-Romagna 41123

Services Offered

Solar InstallationBattery StorageEV Chargingsolar_consultationMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Daikin Comfort Store

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPower

Inverters

SolarEdgeHuaweiZCS Azzurro

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Modena, Emilia-RomagnaReggio Emilia, Emilia-RomagnaParma, Emilia-RomagnaBologna, Emilia-RomagnaRubiera, Emilia-Romagna

Customer Reviews

No reviews yet. Be the first to review AG Energy Srl!

Write a Review

Frequently Asked Questions

How do I get a quote from AG Energy Srl?

You can request a quote through the form on this page or contact AG Energy Srl directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does AG Energy Srl serve?

AG Energy Srl is based in Modena and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does AG Energy Srl hold?

This profile lists the following reported certifications: Daikin Comfort Store. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does AG Energy Srl offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask AG Energy Srl for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask AG Energy Srl for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does AG Energy Srl handle permits and paperwork?

The exact scope is not verified on this profile. Ask AG Energy Srl which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2011
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from AG Energy Srl

Send your project details to request follow-up from AG Energy Srl. Response timing and consultation terms are set by the company.

For AG Energy Srl

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
A

AG Energy Srl

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.